Zinner Consultants
sustainability in policy & practice   
services & projects
people
 

LEED & CHPS PROJECT CONSULTING

Sustainable Building Warner Bros

Leed warner Bros

Green Building

Warner Bros. Studios: Stage 23
LEED-NC 2.2 Gold

Stage 23, the first LEED certified sound stage, has been featured on CNN and in a number of other media outlets. It is challenging to certify a soundstage because it has, by definition, no bathrooms, no landscaping, no daylight and no views, and therefore fewer potential LEED credits. It also has unique technical requirements including acoustical isolation from outside noise, and most tenants are short term. Stage 23 scored high on energy efficiency, helped by a solar electric (photovoltaic) system. It also included over 20% recycled content and regional materials, and low emitting materials. A comprehensive education program helps tenants understand and take advantage of the green features.

LEED Credits Earned  
Sustainable Sites
8
Water Efficiency
0
Energy & Atmosphere
17
Materials & Resources
7
Indoor Environmental Quality
6
Innovation & Design Process
5
Total
43
Possible
69

Project Team  
Architect
HLW International
Mechanical Engineer Kevin A. Smola & Associates
Electrical Engineer Kocher Schirra Goharizi Consulting Engineers
Structural Engineer Structural Focus
Civil Engineer
Psomas
Energy Modeling
Brummitt Energy Associates
Commissioning Agent Servadyne
Contractor
Tectonics Construction

 

 

 

   
back to L&CPC projects
Zinner Consultants
528 21st Place Santa Monica, California 90402    |    t: 310.319.1131    |   f: 310.319.1929